Brultech Greeneye Monitor Manual de usuario Pagina 41

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 43
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 40
Quick Start
Page 40
Steps
The following steps are based on the GEM installed on a 120V/240V residential split-phase panel.
1. Follow the steps in the “GEM Setup” manual selected from the list in Table 2 on page 39
2. Follow the instruction to the point where the GEM Setup page is opened in a browser as shown
in Figure 47 or Figure 48
Figure 47
Figure 48
3. Once the GEM setup page is entered, select “Channel Options” menu.
a. Make sure the voltage display in the neighborhood of 110V to 128V.
b. Set to “Single Phase” unless your system has SPLIT-30 CTs installed, then set to “Single
Phase Special CTs”. Remember to click “Save” after any changes.
c. Make sure 60Hz is selected.
4. Click the “Channel CT” menu option.
5. Determine the most common CT used in the system. Typically this would be Micro-40 CTs.
Select this CT model from the “Select CT” drop down list. Check the “Set all channels to selected
CT” box then click “Save”. This will cause all 32 channels to assume the values of the specified CT.
6. For CTs other than the specified model, enter the channel the CT is connected to, select the CT
from the CT model list and click save. There is one unique exception which applies to 240V loads
using only one CT for monitoring. For these, click the “1-CT/240V” button before saving.
7. Click “Watt” from the menu. This page will display the latest power value from each channel.
This page is automatically refreshed every 8 seconds.
Vista de pagina 40
1 2 ... 36 37 38 39 40 41 42 43

Comentarios a estos manuales

Sin comentarios