Introduction
Page 4
GreenEye Monitor
INTRODUCTION
OVERVIEW
The GreenEye Monitor incorporates a web interface for setting up parameters. The built-in web server
allows a browser to connect to the GEM to perform the setup process.
Early GEM models did not have this capability. GEMs with firmware versions older than “COM firmware
ver 1.70” will not support setup via web interface until the firmware is upgraded. It is recommended to
install “COM firmware ver 2.20” or higher.
FIRMWARE UPGRADE
The procedure for upgrading the firmware depends on the communication option installed in the GEM.
A dedicated manual is available for each communication option. The document code for each option is
listed below.
GEM Setup
WiFi Only Option
GEM Setup
Ethernet Only Option
WiFi / Ethernet Combination
GEM Setup
WiFi/Ethernet Combination
Indirect Communication via the
DashBox
Table 1
REQUIREMENT
This manual provides the procedure for setting up the GEM parameters once the hardware has been
installed. This implies that the following installation steps have been completed:
The current transformers (CT) are installed and connected to the GEM terminals
The potential transformer (PT) is connected
The GEM is powered from the 5V power supply
The GEM is connected to a network via Ethernet connection